Project

General

Profile

Bug #2935

BSC_Tests doesn't yet contain intra-BSC hand-over testing

Added by laforge 6 months ago. Updated about 2 months ago.

Status:
Closed
Priority:
High
Assignee:
Category:
-
Target version:
-
Start date:
02/12/2018
Due date:
% Done:

70%

Estimated time:
Spec Reference:

Description

The BSC_Tests testsuite doesn't yet do testing of intra-BSC (inter-BTS) hand-over. This means we cannot yet automatically test related code in OsmoBSC.

20180212-osmobsc-handover.pcap 20180212-osmobsc-handover.pcap 6.02 KB laforge, 02/12/2018 08:23 PM

History

#1 Updated by laforge 6 months ago

My branch laforge/wip, specifically change Ic47e639a7c8640c736c84a44780fc8e111a64b52 contains a hand-over tests which gets already up to the IPA CRCX/MDCX + corresponding ACK. It is now waiting for the MGCP MDCX for the RAN side connection...

PCAP file of the current state attached

#2 Updated by laforge about 2 months ago

  • Status changed from In Progress to Closed
  • Assignee changed from laforge to neels

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 48.8 MB)