Project

General

Profile

Actions

FieldTestsFieldTests28c3 » History » Revision 5

« Previous | Revision 5/16 (diff) | Next »
Anonymous, 02/19/2016 10:47 PM


This page is about the

= Who brings which equipment? =

nanoBTS 1800

please indicate the number of GSM 1800 nanoBTS units that you could borrow us for the 28c3 network. They will be needed from December 23rd thorugh December 31st. They will be properly insured during the event.

  • laforge: 1
  • sysmocom: 1
  • GSMK: ?
  • Uni-Freiburg: ?
  • Daniel Brune: 3
    ...
Equipment/Checklist/Todo * [ ] license from Bundes-Netzagentur? Responsible: ???

=== Basement === * [ ] nanoBTS 1? Responsible: ??? * [ ] nanoBTS 2? Responsible: ??? * [ ] Lock? Responsible: ??? * [ ] Milled RJ69 Responsible: ??? * [ ] patch kabel? Responsible: ??? * [ ] PoE Switch? Responsibe: ???

=== Groud Floor === * [ ] nanoBTS 1? Responsible: ??? * [ ] nanoBTS 2? Responsible: ??? * [ ] Lock? Responsible: ??? * [ ] Milled RJ69 Responsible: ??? * [ ] patch kabel? Responsible: ??? * [ ] PoE Switch? Responsible: ???

=== Upstairs (main hall) ====
We need to make sure we get the BTS on the light/wifi circle that will pulled up
under the roof. We also need to make sure that the thing is properly connected as
we can not reach this during the whole event.

  • [ ] nanoBTS 1? Responsible: ???
  • [ ] nanoBTS 2? Responsible: ???
  • [ ] Lock? Responsible: ???
  • [ ] Milled RJ69 Responsible: ???
  • [ ] patch kabel? Responsible: ???
  • [ ] PoE Switch? Responsible: ???
  • [ ] Belt for mounting BTS Responsible: ???

[wiki:FieldTests/28c3/CongressWiki Congress Wiki Page]

Files (1)
28c3-config.tar.bz2 28c3-config.tar.bz2 6.7 KB used configuration , 12/26/2011 10:17 PM

Updated by about 8 years ago · 5 revisions

Add picture from clipboard (Maximum size: 48.8 MB)