Project

General

Profile

Actions

Bug #4204

closed

Gerrit verification does not run in parallel

Added by osmith over 4 years ago. Updated over 4 years ago.

Status:
Resolved
Priority:
Normal
Assignee:
Target version:
-
Start date:
09/13/2019
Due date:
% Done:

100%

Spec Reference:

Description

Gerrit verification takes long, because we are currently not running the builds it in parallel.

As mentioned in https://gerrit.osmocom.org/c/osmo-ci/+/5859 the vty and ctrl tests conflict when running in parallel, but we can probably resolve that conflict when running the build in docker.

Actions #1

Updated by osmith over 4 years ago

  • Status changed from New to In Progress
  • % Done changed from 0 to 80

Patch submitted: https://gerrit.osmocom.org/c/osmo-ci/+/15566

...but set to WIP, it isn't working on master yet (probably needs another docker argument). I'll fix this tomorrow. It is already working for gerrit verifications, after fixing this: https://gerrit.osmocom.org/c/osmo-pcu/+/15564

Failed master job, where I tested this:
https://jenkins.osmocom.org/jenkins/job/master-osmo-pcu/1894/FIRMWARE_VERSION=master,WITH_MANUALS=1,label=osmocom-master-debian9,with_dsp=none,with_vty=False/

Actions #2

Updated by osmith over 4 years ago

  • % Done changed from 80 to 90

Patch fixed, now it works for master too.

Actions #3

Updated by osmith over 4 years ago

  • Status changed from In Progress to Resolved
  • % Done changed from 90 to 100
Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 48.8 MB)