Project

General

Profile

all-by-project

Apply Clear

# Project Category Tracker Status Priority Subject Assignee Updated Related issues
  E1/T1 Hardware Interface 8 Collapse all/Expand all
3237 E1/T1 Hardware Interface Feature New Normal Come up with GPS-DO design for E1 Interface vogelchr 06/01/2018 09:50 PM Related to #2484, Related to #3272, Related to #3967
3272 E1/T1 Hardware Interface Feature New Normal next-generation osmo-e1-xcvr board vogelchr 09/10/2018 11:22 AM Related to #3237
3968 E1/T1 Hardware Interface Feature New Normal find enclosure for ICE40 E1 board 04/30/2019 09:41 AM
3967 E1/T1 Hardware Interface Feature New Normal design a custom board for the ICE40 E1 adapter 04/30/2019 09:34 AM Related to #3237
3966 E1/T1 Hardware Interface Feature In Progress Normal finish the USB-E1 ICE40 prototype tnt 04/30/2019 08:49 AM
3965 E1/T1 Hardware Interface Feature In Progress Normal ICE40 based USB E1 adapter tnt 04/30/2019 08:48 AM Related to #3260, Related to #2548, Related to #2547
2484 E1/T1 Hardware Interface Feature Stalled Low Architecture of USB E1/T1/J1 adapter laforge 05/30/2018 03:03 PM Related to #3242, Related to #3237
  Distributed GSM 14 Collapse all/Expand all
4306 Distributed GSM Feature New High GSUP proxy cache: store data persistently 12/12/2019 09:26 PM
4305 Distributed GSM Feature New High GSUP proxy: cache auth tuples to re-use / fall back to simpler auth methods 12/12/2019 07:40 AM
4308 Distributed GSM Support New High thoughts about incorporating credit / billing in D-GSM 12/04/2019 04:08 PM
4253 Distributed GSM Feature New Low in mDNS socket rx, implicitly drop own messages sent out instead of receiving and parsing osmith 11/29/2019 11:54 AM
4261 Distributed GSM Feature In Progress Urgent facilitate GSUP proxy routability: osmo-hlr needs to copy rx source_name to tx destination_name neels 11/29/2019 11:51 AM
4268 Distributed GSM Bug In Progress Urgent duplicate SMS when SMPP handler sends back to the originating MSC neels 11/29/2019 11:49 AM
4309 Distributed GSM Feature In Progress Urgent MOSS stage 2 review item: mslookup mDNS: add IANA permitted TLD to the mslookup queries osmith 12/06/2019 03:59 PM
4237 Distributed GSM Feature In Progress High distributed subscriber lookup library osmith 11/29/2019 10:02 AM
4252 Distributed GSM Feature In Progress High D-GSM manual neels 11/29/2019 11:53 AM
4254 Distributed GSM Feature In Progress High integrate mslookup mDNS client in an SMPP handler osmith 11/29/2019 10:01 AM
4256 Distributed GSM Feature In Progress High create mslookup server in osmo-hlr neels 12/03/2019 10:23 PM
4257 Distributed GSM Feature In Progress High create mslookup client and an initial "trivial" GSUP proxy in osmo-hlr neels 11/29/2019 11:52 AM
4307 Distributed GSM Feature In Progress High test routing SMS-over-GSUP in DGSM neels 12/10/2019 03:30 PM
4319 Distributed GSM Bug In Progress High determine auc_3g_ind from actual source_name of a request, not from the GSUP client conn neels 12/12/2019 08:52 PM Related to #4318
  Core testing infrastructure 1 Collapse all/Expand all
4203 Core testing infrastructure Bug New Low Make ttcn3-bts-test(-latest) artifacts smaller pespin 12/01/2019 09:48 AM
  Cellular Network Infrastructure 61 Collapse all/Expand all
2623 Cellular Network Infrastructure Feature New High SCCP/M3UA: detect restart of osmo-msc and osmo-sgsn neels 12/01/2019 09:10 AM Related to #3403
3127 Cellular Network Infrastructure Bug New High update the [[Osmocom Network In The Box]] wiki page daniel 05/08/2019 02:37 PM
1652 Cellular Network Infrastructure Bug New Normal Expose statistics / KPIs programmatically 03/10/2017 09:35 PM Related to #1653, Related to #1654, Related to #1655, Related to #1766
(876-900/960) Per page: 25, 50, 100, 250, 500

Also available in: Atom CSV PDF

Add picture from clipboard (Maximum size: 48.8 MB)