 = How to create a nanoBTS multi-TRX setup = 

 == Preparation == 

 In order to configure an ip.access nanoBTS multi-TRX setup, you will need 
  * at least two nanoBTS (let's say you have N units, where 1 < N < 5) 
  * N-1 TIB cables (see section below how to make them) 
  * N-1 RF cables (see section below) 
  * N RJ45 cables 
  * N PoE capable Ethernet ports at a switch 

 === TIB cables === 

 ==== The TIB connectors ==== 

 As you may have noticed, the nanoBTS has two connectors called TIB-in and TIB-out. 
 TIB refers to the Timing Interface Bus, a proprietary interface to synchronize the 
 various nanoBTS units in a multi-TRX setup. 

 While upon first sight they may appear to be RJ-45, they are in fact not. 
 Careful inspection will show that while they have the same width as RJ-45, they 
 do actually have two extra pins (one on each side), making it a 10pin connector. 
 The official designation for those connectors is RJ-69. 

 The corresponding plugs and 10pin cables are relatively hard to come by.    In 
 Germany you can order them from http://www.segor.de/ 

 Unfortunately, the RJ-69 sockets in the nanoBTS are not standard, but have a 
 dent on the right side (right of the connectors ''nose'').    We have not been able 
 to find a source for the matching plugs, so we resort to milling part of the 
 standard RJ-69 plug away. 

 You will need two RJ-69 (10pin RJ-45) connectors for each cable.    I suggest you 
 buy some extra, in case you break one during mounting or milling. 

 ==== Milling the RJ-69 connector ==== 

 We don't really have any mechanical specifications for the connectors.    Simply 
 use a small milling tool to remove parts of the tip of the plug until it fits 
 into the socket. 

 FIXME: picture of milled plug 
 ==== Crimping the RJ-69 connectors ==== 

 The crimping is the same like crimping RJ-45 connectors.    Any standard crimping 
 tool should work - with the exception that the two additional pins will not be 
 pushed into the wire but still stand out. 

 (FIXME: Photograph) 

 We have used a screwdriver to manually push those two pins into the plug.    Be 
 careful not to damage the plug nor hurt yourself! 

 Please crimp one connector to each side of the cable, resulting in a 1:1 mapping 
 of the colors.    (FIXME: Picture) 

 === RF Cables === 

 FIXME 

 === Completing the physical setup === 

 You will designate one BTS as the master, and all others as slave. 

 Start from the master TIB-out, connect it to the first slave TIB-in.    Connect 
 the first slave TIB-out with the second slave TIB-in.    Do not create a loop, 
 but simply a chain from one unit to another. 

 === Configuring the Unit IDs === 

 In a multi-TRX setup, the ip.access Unit IDs have to be set in a way that 
 the Site-ID and BTS-ID portions are equal, while the TRX-ID increments. 
 So for example: 
  * 1800/0/0 -- master BTS of multi-TRX setup 
  * 1800/0/1 -- first slave of multi-TRX setup 
  * 1800/0/2 -- second slave of multi-TRX setup (if any) 
  * 1800/0/3 -- third slave of multi-TRX setup (if any) 

 In order to set the Unit ID's accordingly, you can use the [wiki:ipaccess-config] tool. 

 In the following example, we configure the Unit IDs of two BTS.    The '-r' is for restarting 
 the BTS after the Unit ID change: 
 {{{ 
 ./ipaccess-config -u 1800/0/0 -r 192.168.100.120 
 ./ipaccess-config -u 1800/0/1 -r 192.168.100.190 
 }}} 

 If we run [wiki:ipaccess-find] after the BTS have restarted, you will see something 
 along the lines of the following output: 
 {{{ 
 MAC Address='00:02:95:11:11:11'    IP Address='192.168.100.120'    Unit ID='1800/0/0'    Location 1=''    Location 2='BTS_NBT131G' 
  Equipment Version='165a029_55'    Software Version='168a302_v142b13d0'    Unit Name='nbts-00-02-95-11-11-11'    Serial Number='00111111' 
 MAC Address='00:02:95:22:22:22'    IP Address='192.168.100.190'    Unit ID='1800/0/1'    Location 1=''    Location 2='BTS_NBT131G' 
  Equipment Version='165a029_55'    Software Version='168a302_v142b13d0'    Unit Name='nbts-00-02-95-22-22-22'    Serial Number='00222222' 
 }}} 

 The slave TRX will have a green blinking light (indicating OML connection is 
 up), despite your OpenBSC not even running yet.    The reson for this seems to be 
 the fact that the slave TRX connect their OML link to the master TRX and not 
 the BSC! 

 == Configuring OpenBSC == 

 On OpenBSC, you simply configure one BTS (with unit ID of the master TRX) and N 
 number of TRX in that BTS.    No special action required. 

 An example configuration file is attached to this page. 

 == Running OpenBSC == 

 You run OpenBSC as usual. The master BTS will establish the OML link, 
 then the master TRX will establish its RSL link, followed by the slave TRX RSL links. 

 {{{ 
 ./osmo-nitb ./bsc_hack 
 <000d> input/ipaccess.c:632 accept()ed new OML link from 192.168.100.120 
 <000d> input/ipaccess.c:237 Identified BTS 1800/0/0 
 <0005> bsc_init.c:736 bootstrapping OML for BTS 0 
 <000d> input/ipaccess.c:694 accept()ed new RSL link from 192.168.100.120 
 <000d> input/ipaccess.c:237 Identified BTS 1800/0/0 
 <0004> bsc_init.c:897 bootstrapping RSL for BTS/TRX (0/0) on ARFCN 871 using MCC=1 MNC=1 LAC=1 CID=0 BSIC=63 TSC=7 
 <000d> input/ipaccess.c:694 accept()ed new RSL link from 192.168.100.190 
 <000d> input/ipaccess.c:237 Identified BTS 1800/0/1 
 <0004> bsc_init.c:897 bootstrapping RSL for BTS/TRX (0/1) on ARFCN 873 using MCC=1 MNC=1 LAC=1 CID=0 BSIC=63 TSC=7 
 }}} 