Project

General

Profile

Actions

Feature #1623

open

Configure delivery report for the SMPP delivery links

Added by zecke about 8 years ago.

Status:
New
Priority:
Normal
Assignee:
Target version:
-
Start date:
02/24/2016
Due date:
% Done:

0%

Spec Reference:

Description

In case SMPP is used as a delivery method it is not clear if the delivery is meant to be final and a delivery report should be created or if the final system will generate it. As part of the delivery method configuration one should be able to configure if a delivery report is created or not.

No data to display

Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 48.8 MB)