Project

General

Profile

Feature #3098

ramping of transmit power

Added by stsp over 1 year ago. Updated over 1 year ago.

Status:
Rejected
Priority:
Normal
Assignee:
Category:
-
Target version:
-
Start date:
03/22/2018
Due date:
% Done:

0%

Spec Reference:

Description

This feature issue is about ramping of transmit power.

For details, see issue #2591, which this issue was split off from.


Related issues

Related to OsmoBSC - Feature #2591: ramp up cell slowly based on access control class to avoid severe RACH/SDCCH overloadResolved10/23/2017

History

#1 Updated by stsp over 1 year ago

  • Related to Feature #2591: ramp up cell slowly based on access control class to avoid severe RACH/SDCCH overload added

#2 Updated by laforge over 1 year ago

this is already implemented, it just needs to be configured properly.

#3 Updated by laforge over 1 year ago

  • Status changed from New to Rejected
  • Assignee set to stsp

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 48.8 MB)