Project

General

Profile

Feature #5025

Missing TTCN-3 coverage for the Timing Advance loop

Added by fixeria 8 months ago. Updated 4 months ago.

Status:
New
Priority:
Normal
Assignee:
Category:
osmo-bts-trx
Target version:
-
Start date:
02/15/2021
Due date:
% Done:

0%

Spec Reference:
Tags:

Description

As we figured out in #5024, there seems to be no TTCN-3 test case(s) for continuous Timing Advance control:

Harald Welte wrote:

Regarding TTCN3 tests: We also only test the correct TA usage on initial channel establishment (BTS_Tests.TC_rsl_chan_initial_ta) and no tests yet for the TA loop during an active channel.

History

#1 Updated by laforge 4 months ago

  • Assignee set to fixeria

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 48.8 MB)