This page is about the 
2
3
= Who brings which equipment? =
4
5
== nanoBTS 1800 ==
6
7
please indicate the number of GSM 1800 nanoBTS units that you could borrow us for the 28c3 network.  They will be needed from December 23rd thorugh December 31st.  They will be properly insured during the event.
8 2 laforge
 
9
 * laforge: 1
10 4 laforge
 * sysmocom: 1
11 13 stuge
 * GSMK: 1
12 2 laforge
 * Uni-Freiburg: ?
13 4 laforge
 * Daniel Brune: 3
14 1 laforge
...
15 3 laforge
16 5 laforge
== Equipment/Checklist/Todo ==
17 12 stuge
 * [x] license from Bundes-Netzagentur? Responsible: laforge
18
 * [ ] Make sure we have the MOC table? Responsible: stuge
19
 * [ ] Make sure we have a place to sit together? Responsible: stuge
20
 * [ ] Talk to POC? Find people we can give access to our system? Explain them what can be tested/traced? Responsible: stuge
21 10 laforge
 * [ ] Insurance of equipment: Responsible: zecke (I got some instruction, need to verify it)
22 8 laforge
23
=== Equipment room ===
24 12 stuge
 * [ ] Make sure to have a place to put the main machine. Responsible: stuge
25
 * [ ] Make sure we can connect to the EventPhone from there? (MISDN over IP?) Responsible: stuge
26
 * [ ] Make sure we have BTS, etc. in a network routed to us. Responsible: stuge
27 5 laforge
28
=== Basement ===
29
 * [ ] nanoBTS 1? Responsible: ???
30
 * [ ] nanoBTS 2? Responsible: ???
31 11 laforge
 * [ ] Lock?      Responsible: laforge
32 5 laforge
 * [ ] Milled RJ69 Responsible: ???
33
 * [ ] patch kabel? Responsible: ???
34
 * [ ] PoE Switch? Responsibe: ???
35
36
=== Groud Floor ===
37
 * [ ] nanoBTS 1? Responsible: ???
38
 * [ ] nanoBTS 2? Responsible: ???
39 11 laforge
 * [ ] Lock?      Responsible: laforge
40 5 laforge
 * [ ] Milled RJ69 Responsible: ???
41
 * [ ] patch kabel? Responsible: ???
42
 * [ ] PoE Switch? Responsible: ???
43
44 7 laforge
=== Upstairs (main hall) ===
45 6 laforge
46 5 laforge
We need to make sure we get the BTS on the light/wifi circle that will pulled up
47
under the roof. We also need to make sure that the thing is properly connected as
48
we can not reach this during the whole event.
49
50
 * [ ] nanoBTS 1? Responsible: ???
51
 * [ ] nanoBTS 2? Responsible: ???
52 11 laforge
 * [ ] Lock?      Responsible: laforge
53 5 laforge
 * [ ] Milled RJ69 Responsible: ???
54
 * [ ] patch kabel? Responsible: ???
55
 * [ ] PoE Switch? Responsible: ???
56
 * [ ] Belt for mounting BTS Responsible: ???
57
58 3 laforge
[wiki:FieldTests/28c3/CongressWiki Congress Wiki Page]