This page is about the OpenBSC setup at the CCH for the 29C3.
2
3
4
= Configuration =
5
6
This years objective is to provide a more stable GSM service. This is challenging due the change of the venue and the increased space that we need to cover. We can use the night time for experimentation. We are using:
7
8
 * osmo-nitb
9
 * lcr
10 3 stuge
 * mISDN with E1 over IP to connect to the PoC.
11 1
 * Crazy config scripts for the eventphone integration.
12
13
14
= Who brings which equipment? =
15
16
== sysmoBTS 1800 ==
17
18 7 stuge
 * kevin: 1
19 9
 * sylvain: 1 (+2W amp and couple VERT900)
20 10
 * sysmocom: 4
21 1
22
== nanoBTS 1800 ==
23
24 3 stuge
please indicate the number of GSM 1800 nanoBTS units that you could borrow us for the 29c3 network.  They will be needed from December 23rd through December 31st.  They will be properly insured during the event.
25 1
26
 * GSMK: 1
27
 * zecke: 1
28 7 stuge
 * kevin: 2
29 10
 * laforge: 1
30 1
31
== Antennas ==
32 10
 * 2x Kathrein patch Antenne
33
 * 1x Kathrein Rundstrahler
34
 * 2x Kathrein Patch/Teller/Decke
35
 * 1x Kathrein Bidirektionaler Dipol
36
 * 1x Procom PCIPI DCS Flachantenne
37
 * 1x CXL-1801-1 Rundstrahler
38
 * 1x CXL-1801-3 Rundstrahler
39 3 stuge
40
41 4
= Todo =
42 8 stuge
 * [x] Radio planning. Decide on dual-trx vs. single-trx vs. power? Possibly 1x1TRX in two "corners" on each floor, but do some trial and error on location to find out exactly what we need.
43 3 stuge
 * [ ] Talk to POC? Find people we can give access to our system? Explain them what can be tested/traced? Responsible: Peter (maybe jolly?)
44 1
 * [ ] Insurance of equipment: Responsible: Peter
45
 * [ ] Create BoM for switches, cables, PoE injector, PoE switches, RJ69 cables.. Responsible: Peter
46
 * [ ] Lock?      Responsible: ???
47
 * [ ] Milled RJ69 Responsible: ???
48
 * [ ] patch kabel? Responsible: ???
49 8 stuge
 * [ ] PoE Switch? All switchports that we will connect to will be PoE-enabled, but let's bring injectors anyway. Responsible: ???
50 1
 * [ ] Belt for mounting BTS Responsible: ???
51
 * [ ] Create complete checklist. Responsible: ???
52 11
 * [ ] Mount for sysmoBTS|nanoBTS, duplexer, antenna, amp. Responsible: zecke/laforge.
53 1
 * [ ] Courier to transport sysmocom and other equipment to the venue by the 25th. Responsible: zecke.
54
 * [x] Get SIM Cards to be sold. Responsible: zecke, at least 500 sysmoSIM cards
55 6
 * [x] Make sure we have a place to sit together and store equipment. Yes! '''Saal 11'''. Responsible: Peter
56 10
 * [x] license from Bundes-Netzagentur? Requested 10 ARFCNs, on the way (4.12.2012). Get nervous by next week. Responsible: zecke
57 2
58 3 stuge
== Connectivity ==
59
The neccessary connectivity for both OpenBSC and OpenBTS has been planned, but the boxes below will only be checked when the connectivity has actually been established on location.
60
 * [x] Make sure to have a place to put the main machine. Likely '''Zwergenlager''', but we're flexible. Responsible: Peter
61
 * [] Make sure we can connect to the !EventPhone from there? (Likely MISDN over IP, maybe SIP.) Responsible: Peter
62
 * [] Make sure we have BTS, etc. in a network routed to us. Responsible: Peter
Add picture from clipboard (Maximum size: 48.8 MB)