FieldTestsFieldTests29c3 » History » Version 12

Anonymous, 02/19/2016 10:48 PM

1 12
This page is about the [[OpenBSC]] setup at the CCH for the 29C3.
2 1
3
4
5 12
h1. Configuration
6
7
8 1
This years objective is to provide a more stable GSM service. This is challenging due the change of the venue and the increased space that we need to cover. We can use the night time for experimentation. We are using:
9
10 12
* osmo-nitb
11
* lcr
12
* mISDN with E1 over IP to connect to the PoC.
13
* Crazy config scripts for the eventphone integration.
14 1
15
16
17 12
h1. Who brings which equipment?
18 1
19
20
21 12
h2. sysmoBTS 1800
22
23
24
* kevin: 1
25
* sylvain: 1 (+2W amp and couple VERT900)
26
* sysmocom: 4
27
28
29
h2. nanoBTS 1800
30
31
32 1
please indicate the number of GSM 1800 nanoBTS units that you could borrow us for the 29c3 network.  They will be needed from December 23rd through December 31st.  They will be properly insured during the event.
33
34 12
* GSMK: 1
35
* zecke: 1
36
* kevin: 2
37
* laforge: 1
38 10
39
40 12
h2. Antennas
41 10
42 12
* 2x Kathrein patch Antenne
43
* 1x Kathrein Rundstrahler
44
* 2x Kathrein Patch/Teller/Decke
45
* 1x Kathrein Bidirektionaler Dipol
46
* 1x Procom PCIPI DCS Flachantenne
47
* 1x CXL-1801-1 Rundstrahler
48
* 1x CXL-1801-3 Rundstrahler
49 3 stuge
50 12
51
52
h1. Todo
53
54
* [x] Radio planning. Decide on dual-trx vs. single-trx vs. power? Possibly 1x1TRX in two "corners" on each floor, but do some trial and error on location to find out exactly what we need.
55
* [ ] Talk to POC? Find people we can give access to our system? Explain them what can be tested/traced? Responsible: Peter (maybe jolly?)
56
* [ ] Insurance of equipment: Responsible: Peter
57
* [ ] Create BoM for switches, cables, PoE injector, PoE switches, RJ69 cables.. Responsible: Peter
58
* [ ] Lock?      Responsible: ???
59
* [ ] Milled RJ69 Responsible: ???
60
* [ ] patch kabel? Responsible: ???
61
* [ ] PoE Switch? All switchports that we will connect to will be PoE-enabled, but let's bring injectors anyway. Responsible: ???
62
* [ ] Belt for mounting BTS Responsible: ???
63
* [ ] Create complete checklist. Responsible: ???
64
* [ ] Mount for sysmoBTS|nanoBTS, duplexer, antenna, amp. Responsible: zecke/laforge.
65
* [ ] Courier to transport sysmocom and other equipment to the venue by the 25th. Responsible: zecke.
66
* [x] Get SIM Cards to be sold. Responsible: zecke, at least 500 sysmoSIM cards
67
* [x] Make sure we have a place to sit together and store equipment. Yes! *Saal 11*. Responsible: Peter
68
* [x] license from Bundes-Netzagentur? Requested 10 ARFCNs, on the way (4.12.2012). Get nervous by next week. Responsible: zecke
69
70
71
h2. Connectivity
72
73
The neccessary connectivity for both [[OpenBSC]] and [[OpenBTS]] has been planned, but the boxes below will only be checked when the connectivity has actually been established on location.
74
* [x] Make sure to have a place to put the main machine. Likely *Zwergenlager*, but we're flexible. Responsible: Peter
75
* [] Make sure we can connect to the EventPhone from there? (Likely MISDN over IP, maybe SIP.) Responsible: Peter
76
* [] Make sure we have BTS, etc. in a network routed to us. Responsible: Peter