This page is about the OpenBSC setup at the CCH for the 29C3.
2
3
4
= Configuration =
5
6
This years objective is to provide a more stable GSM service. This is challenging due the change of the venue and the increased space that we need to cover. We can use the night time for experimentation. We are using:
7
8
 * osmo-nitb
9
 * lcr
10 3 stuge
 * mISDN with E1 over IP to connect to the PoC.
11 1
 * Crazy config scripts for the eventphone integration.
12
13
14
= Who brings which equipment? =
15
16
== sysmoBTS 1800 ==
17
18 7 stuge
 * kevin: 1
19 1
 * sysmocom: ?
20
21
== nanoBTS 1800 ==
22
23 3 stuge
please indicate the number of GSM 1800 nanoBTS units that you could borrow us for the 29c3 network.  They will be needed from December 23rd through December 31st.  They will be properly insured during the event.
24 1
25
 * GSMK: 1
26
 * zecke: 1
27 7 stuge
 * kevin: 2
28
 * laforge: ?
29 1
 * ???: ?
30
31 3 stuge
== Nokia !MetroSite ==
32
33
 * ?: ?
34
35
= Todo =
36 4
 * [o] license from Bundes-Netzagentur? Requested 10 ARFCNs, on the way (4.12.2012). Get nervous by next week. Responsible: zecke
37
 * [ ] Radio planning. Decide on dual-trx vs. single-trx vs. power. Responsible: depends on BNetzA response
38 3 stuge
 * [ ] Talk to POC? Find people we can give access to our system? Explain them what can be tested/traced? Responsible: Peter (maybe jolly?)
39
 * [ ] Insurance of equipment: Responsible: Peter
40
 * [ ] Create BoM for switches, cables, PoE injector, PoE switches, RJ69 cables.. Responsible: Peter
41 1
 * [ ] nanoBTS 2? Responsible: ???
42
 * [ ] Lock?      Responsible: ???
43
 * [ ] Milled RJ69 Responsible: ???
44
 * [ ] patch kabel? Responsible: ???
45
 * [ ] PoE Switch? Responsible: ???
46
 * [ ] Belt for mounting BTS Responsible: ???
47
 * [ ] Create complete checklist. Responsible: ???
48
 * [ ] Enclosure for sysmoBTS, duplexer, antenna, amp. Responsible: zecke.
49
 * [ ] Courier to transport sysmocom and other equipment to the venue by the 25th. Responsible: zecke.
50 6
 * [x] Get SIM Cards to be sold. Responsible: zecke, at least 500 sysmoSIM cards
51
 * [x] Make sure we have a place to sit together and store equipment. Yes! '''Saal 11'''. Responsible: Peter
52 2
53 3 stuge
== Connectivity ==
54
The neccessary connectivity for both OpenBSC and OpenBTS has been planned, but the boxes below will only be checked when the connectivity has actually been established on location.
55
 * [x] Make sure to have a place to put the main machine. Likely '''Zwergenlager''', but we're flexible. Responsible: Peter
56
 * [] Make sure we can connect to the !EventPhone from there? (Likely MISDN over IP, maybe SIP.) Responsible: Peter
57
 * [] Make sure we have BTS, etc. in a network routed to us. Responsible: Peter