FieldTests 27c3 » History » Revision 3
Revision 2 (laforge, 02/19/2016 10:47 PM) → Revision 3/8 (laforge, 02/19/2016 10:47 PM)
= OpenBSC field test at 27c3 = At the [http://events.ccc.de/congress/2010/ 27th annual Chaos Communication Congress], the OpenBSC development team was doing a field test. More information can be found at [http://events.ccc.de/congress/2010/wiki/GSM] == Installation == The installation at 27c3 consisted of 6 ip.access [wiki:nanoBTS], forming 3 BTS with 2 TRX each. All of them were connected to a single instance of [wiki:OpenBSC], using the mncc_sock branch, interfacing with [wiki:lcr] as an external MNCC application. == Report == FIXME