= Chaos Communication Camp 2011 =
3
4
At the [http://events.ccc.de/camp/2011/ CCC Camp 2011], we will again be running an experimental OpenBSC network.
5
6
The large area of the camp site and the number of users (expected in the 2,000 to 4,000 user range) make this an
7
ideal test installation for OpenBSC.
8
9
== Netork structure ==
10
11
Given that there is only a maximum number of 10 ARFCN in the DECT guard band that we could use,
12
we cannot really afford to run many small BTSs.  May small BTSs (single-arfcn) would mean that the capacity
13
is split/fragmented over the camp site.
14
15
Running few but large BTSs (many TRX) at higher power seems like the better strategy.  It delivers
16
capacity without restricting it locally, i.e. capacity can be used anywhere on the camp.
17
18 4 laforge
== License / Approval ==
19
20
We have a license from the German regulatory authority (Bundesnetzagentur) to operate on the following 6 ARFCN:
21
22
||ARFCN||Uplink||Downlink||Purpose||
23
||871||1782.0||1877.0||BTS 0 / TRX 0||
24
||873||1782.4||1877.4||BTS 1 / TRX 0||
25
||875||1782.8||1877.8||nanoBTS+booster||
26
||877||1783.2||1878.2||BTS 0 / TRX 1||
27
||879||1783.6||1878.6||BTS 1 / TRX 1||
28
||881||1784.0||1879.0||BTS 0 / TRX 2||
29
30
The license covers ERP (Effective Radiated Power) of 5W on each of the ARFCN, on GPS coordinates within the Camp site, with antenna heights of up to 18m above ground for the duration of August 3rd through August 15.
31
32 1 laforge
== Materials ==
33 3 laforge
34
=== BTS and accessories ===
35 1 laforge
36 4 laforge
There will be two BTSs:
37
 * BTS 0 with 3 TRX (Shelter 6)
38
  * Motorola MetroSite with 48V power requirement
39
  * Antenna pole will be fixed to the wall right of the right shelter door
40
  * Antenna cabling will go into the former battery room of the shelter via the ventilation outlets
41
  * BTS and 48V power supply will be inside the former battery room
42
 * BTS 1 with 2 TRX (Shelter 3)
43
  * Antenna pole will be welded to the outside of the right shelter door
44
  * BTS will be wall-mounted to the inside of the right shelter door
45
  * BTS will be powered directly from 230V AC mains
46
  * E1 cabling will go from this BTS to the former battery room of Shelter 6
47 1 laforge
48 4 laforge
=== Cabling ===
49 1 laforge
50 4 laforge
Antenna cabling will be H2000flex cable (2dB @ 10m / 2GHz).
51
52
E1 cabling will be CAT6 based for proper shielding against all the EMI on-site.
53
54 1 laforge
=== BSC and core network ===
55
56 4 laforge
We will run a single machine with DAHDI E1 cards and [wiki:osmo-nitb] attached to a [wiki:lcr] via MNCC.
57 1 laforge
58 4 laforge
This BSC machine will be located in the former battery room of Shelter 6, next to BTS1.  E1 cabling will go from the BSC
59
to both of the BTS.
60 3 laforge
61 4 laforge
A dedicated Ethernet cable for administrative access will connect the BSC machine with the main tent of the GSM Village.
62
63
A dedicated Ethernet or E1 cable for Voice uplink will connect the BSC machine with the PoC phone switch.
64
65 3 laforge
== Equipment availability ==
66 1 laforge
67 3 laforge
This is just a list of random equipment that we have at our disposal:
68 1 laforge
69
=== Harald ===
70 3 laforge
71
 * several nanoBTS 1800
72 4 laforge
 * 100m H2000flex cable
73 3 laforge
 * 20 N plugs for H2000flex
74
 * 6 7/16 to N adapters
75 4 laforge
 * 2 5dBi omnidirectional antenna (N-female)
76
 * 5 3dBi omnidirectional antenna (N-female)
77 3 laforge
 * various SMA-N pigtails and other adapters
78
 * 6 hybrid combiner/duplexer units from Horizon BTS (2x SMA PA in, 1x 7/16 Antenna, 1x N for Rx out)
79
80
=== Sylvain ===
81
82
 * 1 resistive combiner/splitter (up to 2w)
83
 * 1 duplexer board
84
 * 1 LNA + rx filter board
85
 * 2 duplexer + LNA + Rx filter boards
86
87
All SMA, all rated 3W max power. All 6V power supply
88
89
=== Dieter ===
90
91
 * 2 nokia BTS, each 2 TRX
92
  * no combiner / splitter / duplexer, i.e. 2x Tx out and 2x Rx in
93
  * E1 back-haul
94
  * OpenBSC code has been completed and tested with 2 TRX
95 1 laforge
  * need to be transported to Berlin, no good packaging, heavy
96 5 laforge
= Thanks / Credits =
97
98
We'd like to thank the following organizations and individuals for helping us:
99
 * FH Deggendorf for borrowing us two Nokia Metrosite BTS
100
 * Dieter Spaar for adding Nokia A-bis support to OpenBSC on short notice
101
 * NETZING AG for providing 5 GSM 1800 Antennas
102
 * sysmocom GmbH for providing antenna and E1 cabling, installation materials, the OpenBSC machine, etc.
103
 * Universität Freiburg for two nanoBTS boosters and two GSM 1800 omni antennas
104
 * Luftfahrtmuseum Finowfurt for providing the antenna poles and mounting them to the shelters
105
 * Bundesnetzagentur for giving us regulatory approval