Actions
FieldTests 27c3 » History » Revision 1
Revision 1/8
| Next »
laforge, 02/19/2016 10:47 PM
initial 27c3 page
= OpenBSC field test at 27c3 =
At the [http://events.ccc.de/congress/2010/ 27th annual Chaos Communication Congress], the OpenBSC
development team was doing a field test.
More information can be found at [http://events.ccc.de/congress/2010/wiki/GSM]
InstallationThe installation at 27c3 consisted of 6 ip.access [nanoBTS], forming 3 BTS with 2 TRX each.
All of them were connected to a single instance of [OpenBSC], using the mncc_sock branch,
interfacing with [lcr] as an external MNCC application.
FIXME
Updated by laforge about 8 years ago · 1 revisions