Project

General

Profile

FieldTests 27c3 » History » Version 1

laforge, 02/19/2016 10:47 PM
initial 27c3 page

1 1 laforge
= OpenBSC field test at 27c3 =
2
3
At the [http://events.ccc.de/congress/2010/ 27th annual Chaos Communication Congress], the OpenBSC
4
development team was doing a field test.
5
6
More information can be found at [http://events.ccc.de/congress/2010/wiki/GSM]
7
8
== Installation ==
9
10
The installation at 27c3 consisted of 6 ip.access [nanoBTS], forming 3 BTS with 2 TRX each.
11
12
All of them were connected to a single instance of [OpenBSC], using the mncc_sock branch,
13
interfacing with [lcr] as an external MNCC application.
14
15
== Report ==
16
FIXME
Add picture from clipboard (Maximum size: 48.8 MB)