Project

General

Profile

Actions

Feature #4922

open

Implement MS Power Control

Added by keith over 3 years ago. Updated over 2 years ago.

Status:
In Progress
Priority:
Normal
Assignee:
Category:
-
Target version:
-
Start date:
12/24/2020
Due date:
% Done:

90%

Spec Reference:

Description

For a BTS that does not implement MS uplink power control, such as the RBS6k, we need to have the BSC process MEASUREMENT RESULT messages and send MS POWER CONTROL messages.

Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 48.8 MB)